Portfolio

Walters Primary Substation

Johnson City, Tennessee

Allen & Hoshall provided complete Design and Construction Administration Services for the construction of a 161/69 kV Substation. This station was necessary to meet the growing power demands on the west side of Washington County. The construction phase lasted 15 months including equipment procurement.

The design included a 161 kV loop feed from TVA’s transmission system, 161 kV substation breaker, 161 kV and 69 kV transformer interrupting devices, two 161/69 kV power transformers, three 69 kV feeder breakers and an underground 69 kV feeder to an adjacent 69/13 kV substation. The design also included provisions for a third power transformer and two spare feeder bays.

Major Equipment

• 2- 75/100/125 MVA 161/69 kV Power Transformers
• 1- 161 kV, 2000 Amp Power Circuit Breaker
• 2- 161 kV, 1200 Amp Circuit Switchers for transformer isolation
• 2- 69 kV 1200 Amp Power Circuit Breakers for transformer isolation
• 5- 69 kV Breaker bays with 3 69 kV, 1200 Amp Power Circuit Breakers
• 1- 69 kV, 1200 amp Bus Tie Breaker
• 1- Relay Enclosure with associated relaying equipment

Back to market

News

View All »