The City of Memphis owns and operates an extensive wastewater management infrastructure system with over 3,600 miles of wastewater collection pipeline.
Read MoreAllen & Hoshall provided a field survey of the site, concept ideas for repair of the sewer, engineering design drawings, specifications and contract documents for bidding and constructing a repair of the interceptor.
Read MoreThe Northwest Aerated Lagoon Wastewater Treatment Plant was placed into service in 1998 with a design capacity of 3.0 mgd to treat an influent BOD load of 5,004 lbs./day. At the commencement of this project, the treatment plant would reach its design capacity in 20 months.
Read MoreAllen & Hoshall is providing engineering and surveying services to study the hydrologic and hydraulic characteristics of the 4,000+ acre Sweetbrier Drainage Basin and to develop a series of recommendations to improve drainage conditions throughout the study areas.
Read MoreAllen & Hoshall is serving as the Program Manager and engineer to assist the City of Vicksburg in its compliance with an EPA Order on Consent.
Read MoreServices included sewer alignment; preparation of easements plats and descriptions; construction drawings, specifications and contract documents; bidding phase services; an limited construction administration services.
Read More